01The Brief
Three floors of warm-shell office in the Fort Point district, leased speculatively, so the ceiling had to suit any future fit-out.
02Acoustic Challenge
A 3.4m floor-to-floor left only a 280mm ceiling void, which forced tight services coordination at high density.
03TRI-STATE ACOUSTICS's Solution
A 600 by 600 mineral fibre tile field with linear baffle accent strips at the perimeter, holding acoustic performance and visual rhythm without costing headroom.
04Outcome
All three floors leased within 90 days of handover, with no acoustic complaints in the first-year post-occupancy review.
Systems Deployed
Mineral fibre tilebaffle accent

